A kitchen remodel is an exciting but time-intensive project that requires careful planning and patience. If you’re wondering how long it takes to complete a kitchen renovation, the timeline can vary based on the scope of work, materials, and contractor availability. Here’s a breakdown of the different phases and what to expect.

Average Kitchen Remodel Timeline

A full kitchen remodel typically takes anywhere from 6 to 12 weeks, depending on the complexity of the project. Smaller updates may take as little as 2 to 4 weeks, while extensive renovations involving structural changes can extend beyond 3 to 6 months.

Phases of a Kitchen Remodel

1. Planning and Design (2-4 Weeks)

Before demolition begins, you’ll need to finalize your design, select materials, and get contractor estimates. This stage includes:

  • Defining your budget

  • Choosing cabinets, countertops, flooring, and appliances

  • Creating blueprints and obtaining necessary permits

2. Ordering Materials (4-8 Weeks)

Custom cabinets, countertops, and specialty items often have long lead times. It’s crucial to order materials early to avoid delays.

3. Demolition and Preparation (1-2 Weeks)

Once materials are ordered, the old kitchen is removed. This phase may involve:

  • Tearing out cabinets, countertops, and flooring

  • Addressing plumbing and electrical needs

  • Structural modifications if needed

4. Installation (4-8 Weeks)

This is the most time-consuming phase, where the new kitchen starts to take shape:

  • Cabinets & Flooring: Installed first to provide a framework

  • Countertops & Appliances: Measured and installed after cabinets are in place

  • Plumbing & Electrical: Final connections are made

5. Finishing Touches (1-2 Weeks)

Final inspections, painting, backsplash installation, and cleaning wrap up the project before you can enjoy your new kitchen.

Factors That Can Affect the Timeline

  • Permit Approvals: Some renovations require city approval, which can add weeks.

  • Custom vs. Stock Materials: Custom items take longer to arrive.

  • DIY vs. Hiring Pros: DIY projects may take longer due to learning curves and availability.

  • Unexpected Delays: Hidden structural issues or supply chain disruptions can extend the timeline.

While every kitchen remodel is unique, proper planning can help ensure a smooth renovation. To stay on schedule, work with experienced professionals and order materials early.

Thinking about remodeling your kitchen? Start planning today to bring your dream kitchen to life!

Matt Witte strives to be the best realtor in Andover MA.

Any questions about real estate, reach out to Matt Witte Andover Realtor MA